
Building Envelope Evaluations Help Prevent Costly Damage
November 12, 2020
Building Envelope Evaluations Help Prevent Costly Damage
While most commercial building owners periodically have their roof systems inspected, other crucial building envelope evaluations are often overlooked. Analyzing a commercial building’s masonry, exterior insulation finishing system (EIFS), glass, and insulated wall panels are among the most critical ways a building envelope evaluation can help prevent costly damage and energy inefficiencies.
Defining a Building Envelope
The Building Envelope is the shield that surrounds and protects the entire building by controlling the flow of “energy” between the inside and outside environments. Whether this “energy” takes on the form of thermal convection, air leakage, water vapor, or bulk water, the Building Envelope must be designed and constructed properly to ensure that it responds effectively. Building owners must be confident that all aspects of a Building Envelope are performing as intended in order to extend the life cycle of the structure and satisfy energy and fire code requirements.
Common Building Envelope Failures
Common causes of Building Envelope failures can often be attributed to operational damage, tornadoes, hurricanes, snow storms and general building aging. Below are several common occurrences to look for:
- Weather stripping on doors deteriorating
- Holes drilled in wall systems left unsealed
- Window system sealant failures
- Control joints losing their sealant
- Holes in mortar joints left unsealed
- Wall system flashing failures
Problems Caused by Building Envelope Failures
Regardless of the type of building, the Building Envelope, including the roof, walls, windows and structure, should be tested at a minimum of every 5 years to be certain problems and significant damage do not occur. Types of problems and damage include:
- Significant exterior wall damage
- Structural failure
- Damaged flooring
- Mold growth on the inside surfaces of gypsum drywall
- Heating and cooling system inefficiencies
Completing a Building Envelope Evaluation
A Building Envelope evaluation is generally as simple as a visual inspection of the interior and exterior of a building by an experienced professional. Munger Construction is readily available to perform Building Envelope evaluations to ensure buildings are structurally sound, compliant with local, state and federal regulations and codes, and that all exterior features are performing at their maximum capacity and efficiency. Our team will identify any issues of concern and can assist in developing and implementing a plan to improve your Building Envelope.
Recent News

Pre-Engineered Metal Buildings: The Smart Choice for Modern Commercial Construction in Connecticut
July 16, 2026

The Hidden Costs of Deferred Maintenance: How a $500 Repair Can Become a $50,000 Project
July 15, 2026

Munger Construction Named to Metal Construction News Top 100 Metal Builders List for 2026
May 5, 2026

Munger Construction and Industrial Building Systems Earn Four Honors in 2026 Varco Pruden Hall of Fame Awards
May 5, 2026

Pat Munger Construction Company, Inc. Announces Appointment of Cal Connelly as Construction Solutions Advisor
April 7, 2026

Monthly Meeting: Strengthening Project Communication Across Our Teams
February 12, 2026

Project in Progress: Town of Madison, Madison Hose Company Number One Firehouse Addition
January 20, 2026
