Project Overview

Munger’s turnkey, design/build solution enabled Total Tree Care to consolidate multiple locations and merge a newly formed business into one flexible, cost effective, warehouse and garage with more outside yard space.

Commercial Building Facilities

New Construction

Gallery

See Our Work

    Testimonial

    What the client had to say about us

    Testimonial
    "I wouldn’t have imagined that such a large project would go so smoothly. The Munger team led by Joe Pierandi managed the project for me. Munger will continue to beat the commercial builder stereotype by delivering what they say they’re going to deliver."

    Luke Williams

    President, Total Tree Care

    Case Study

    The Situation

    Seasonality affects the ability to keep crews busy during the winter. In 1994, the owners launched Arbor Oil to supply heating oil and services to customers in its regional area. Arbor Oil became successful as a stand-alone company and provides a seasonal revenue complement to Total Tree Care. Both companies shared a common facility.

    Problem

    The Challenges

    1

    Two dissimilar businesses need a new home with the flexibility for future expansion, modification, and improved working conditions for 30 employees.

    2

    Minimize owner’s time involvement with architects, builders, and subcontractors.

    3

    The delivery method for tick repellant and fertilizer is water-based; as a result, truck plumbing and pumps are prone to freeze in early spring and late fall. Furthermore, on September 11, 2001, the DOT initiated more stringent standards for HAZMAT oil truck transporters by requiring them to be securely garaged.

    4

    The Regional Water Authority restricts the proximity of chemicals to public water supplies.

    5

    No map or history identified the hidden barite mines and sunken well, which caused the excavator’s vibratory roller to sink 8-feet into the soil. Large amounts of unsuitable soil containing buried wood chips and gravel had to be removed and replaced. Costs would be covered by out-of-pocket funds.

    Solution

    The Resolutions

    1

    Clear-span multifunctional Varco Pruden building, which can be easily expanded or modified, provides cost effective office, warehouse and garage with more outside yard space.

    2

    Turnkey design/build solution by Pat Munger Construction.

    3

    Weather-tight, insulated, and secure garage for specialty vehicles.

    4

    A 50-gallon per minute water line from the street to the rear garage allows trucks to be filled inside during harsh conditions.

    5

    Without affecting the project timeline and maintaining a focus on minimizing unplanned costs, Munger recruited Dr. Clarence Welti, who recommended a soil solution that was implemented by subcontractor, Tenedine Construction.

    Outcome

    the final product

    Employees enjoy their new professional work environment, which supports both comfort and productivity. By housing its vehicles on-site, Total Tree Care is now able to operate a longer tree care season and generate additional revenue, while also reducing maintenance costs by eliminating outside exposure to equipment. The new location offers ample yard space to recycle wood products into high-quality landscape mulch, a new product line that has further boosted revenues. Conveniently located near Interstate 691, the facility provides quick access to customers, enhancing overall service efficiency. Double-pane, tinted windows deliver energy savings through improved greenhouse efficiency, especially when the sun is low in the sky during fall and winter. The building’s design also supports long-term growth without space constraints and ensures compliance with both DOT and Water Authority requirements.