New England Propeller
March 10, 2015
New England Propeller has been a customer of Munger Construction since Pat Munger himself was running the business more than 30 years ago. The challenge of this construction project was the positioning of the new building. According to fire code regulations, the new building could not be attached to the existing building on site. The new building was constructed a distance away with a fire rated connector going from the existing building to the new one to enable movement between the two buildings without going outside.
Placement of the new building required Munger to design a unique loading dock with a sloped floor to accommodate the differences in height of the finished floor of each building. The floor of the fire-rated connector had to be sloped at the perfect pitch to allow fully loaded forklifts to navigate the uphill slope. If the slope was too steep, the forklifts could not make the climb. If the slope was too low, the loading docks would not operate properly.
Ultimately the new building successfully maximized warehouse space while avoiding zoning variance issues and costly fire rating expenses. Finally, following construction, a 114 kw PV solar system was installed on the roof of the new building for their energy needs.
- 11,000 SF, Pre-engineered Varco Pruden steel building
- New warehouse facility offers high bay storage capabilities.
Recent News

Pre-Engineered Metal Buildings: The Smart Choice for Modern Commercial Construction in Connecticut
July 16, 2026

The Hidden Costs of Deferred Maintenance: How a $500 Repair Can Become a $50,000 Project
July 15, 2026

Munger Construction Named to Metal Construction News Top 100 Metal Builders List for 2026
May 5, 2026

Munger Construction and Industrial Building Systems Earn Four Honors in 2026 Varco Pruden Hall of Fame Awards
May 5, 2026

Pat Munger Construction Company, Inc. Announces Appointment of Cal Connelly as Construction Solutions Advisor
April 7, 2026

Monthly Meeting: Strengthening Project Communication Across Our Teams
February 12, 2026

Project in Progress: Town of Madison, Madison Hose Company Number One Firehouse Addition
January 20, 2026