
Dougherty Oil Company
March 9, 2015
Following demolition of an existing wood framed building, Munger constructed a 5,500 SF Varco Pruden, pre-engineered steel building to house the day-to-day operations of Dougherty Oil Company’s fuel oil and heating/air conditioning business. The new building includes 1,200 SF of office space, including a conference room, lunchroom, three private offices, and reception area. The remainder of the space houses the shop area including bay space for the oil and service trucks to be housed inside.
- Masonry and attractive color scheme provide aesthetic appeal.
Special features include a pleasing exterior with masonry on the front of the building and an attractive color scheme utilized throughout the facility. The shop area includes radiant floor heat, which heats the concrete slab as a mass, warming things evenly, with low maintenance and minimal energy usage.
Recent News

Pre-Engineered Metal Buildings: The Smart Choice for Modern Commercial Construction in Connecticut
July 16, 2026

The Hidden Costs of Deferred Maintenance: How a $500 Repair Can Become a $50,000 Project
July 15, 2026

Munger Construction Named to Metal Construction News Top 100 Metal Builders List for 2026
May 5, 2026

Munger Construction and Industrial Building Systems Earn Four Honors in 2026 Varco Pruden Hall of Fame Awards
May 5, 2026

Pat Munger Construction Company, Inc. Announces Appointment of Cal Connelly as Construction Solutions Advisor
April 7, 2026

Monthly Meeting: Strengthening Project Communication Across Our Teams
February 12, 2026

Project in Progress: Town of Madison, Madison Hose Company Number One Firehouse Addition
January 20, 2026

