High bay storage area designed to accept 10-ton crane system.
ProFlow Inc.’s continued growth and development created a need for more storage and assembly space. Munger completed a 6,000 SF, Varco-Pruden, pre-engineered steel building addition to ProFlow’s existing facility. The new addition features a high bay storage area with the ability to accept a 10-ton crane system.